IPB


Welcome Guest ( Log In | Register )

Profile
Personal Photo
Rating
 
Options
Options
Personal Statement
hmcparadise doesn't have a personal statement currently.
Personal Info
hmcparadise
Junior Member
Age Unknown
Gender Not Set
Location Unknown
Birthday Unknown
Interests
No Information
Statistics
Joined: 24-July 08
Profile Views: 36*
Last Seen: 9th August 2008 - 12:48 PM
Local Time: Oct 12 2008, 10:45 AM
3 posts (0.04 per day)
Contact Information
AIM No Information
Yahoo No Information
ICQ No Information
MSN No Information
* Profile views updated each hour

hmcparadise

Members

**


Topics
Posts
Blog
Comments
Friends
My Content
6 Aug 2008
Hello all

We have high voltage supply where our meter is. Between the high voltage supply and
low voltage loads there is a stepdown transformer.

If we correct the Pf at the low voltage side of the transformer, at the loads, from
a cost point of view, can we expect to see an improvment in our bills?
25 Jul 2008
Hello all

I am faced with a situation and I would really appreciate some input from anyone that can offer advise.
I have done Auto PFC installations at a few low voltage sites and the savings are significant. This is the
first site with a hi voltage metered circuit, so I can use some guidance here.

I have a site with a 13KV 3ph 860KVA service.
The utility company has their meters at the entry point off the 13KV service on to the property.
I do know that the PF off the grid is at 0.65 lag.
The service enters the site and there is a big loop around the property and at 6 points there
are step down transformers, some to 480VAC and others to 240VAC.
The perpose of the loop is so that any segment can be disconnected while leaving all other points energized.

I seem to be haveing no luck finding any auto PFC manufacturers that will offer Auto PFC
at the 13KV high voltage side. (If anyone can offer a company name and/or a contact number, email,
thank you.)

If I put in multiple Auto PFC at the low voltage sides of the step downs will there still be a
cost savings improvment on the meter / billing with the PFC being done (behind) the transformers?

Crude one line (I hope this text drawing stays intact)

utility feed
13KV 3ph 860KVA
|
|
X HV service disconnect and meter
|
----------------------------------------------------------
| |
| |
| |
| |
--X--X------X--X------X--X-------X--X------X--X---X--X-
| | | | | |
X X X X X X < HV disconnect
| | | | | |
T T T T T T <step down transformers
| | | | | |
X X X X X X < LV disconnect
| | | | | |
| | | | | |
| | | | | |
LOADS LOADS LOADS LOADS LOADS LOADS
Last Visitors
hmcparadise has no visitors to display.

Comments
Other users have left no comments for hmcparadise.

Friends
There are no friends to display.


RSS Lo-Fi Version Time is now: 12th October 2008 - 02:45 PM
hosted by : L M Photonics Ltd